Deck replacement in Lebanon, NJ: decking, stairs and aluminum railing
Deck Construction · Lebanon, NJ · completed October 2026

We just finished a deck replacement in Lebanon, NJ. We put down new decking, built new stairs and installed new railing. The goal was a deck that's safer and easier to get around on.
The problem
The tricky part was taking out the old pieces without disturbing the structure that was staying. The new parts had to fit right, and the whole deck had to pass the safety checks.
What we did
We pulled the old decking and laid new boards, added new stairs and put in new railing. Most of the work came down to keeping everything lined up and fastened down properly so it's safe to use.
Materials
- Concrete mix
- Sonotubes
- 6x6 pressure-treated posts
- 2x8, 2x10, 2x12 pressure-treated lumber
- Ledger board
- Rim joists
- Floor joists
- Beams
- Joist blocking
- Joist hangers
- Post bases and connectors
- Structural screws and bolts
- Ledger flashing
- Joist tape
- Trex composite deck boards
- Trex picture-frame border boards
- Trex fascia boards
- Trex hidden fasteners and starter clips
- Trex composite screws
- Trex railing kits
- Railing posts and post sleeves
- Railing caps and skirts
- Stair stringers
- Trex stair treads
- Trex stair risers
- Stair railing and handrails
- Stair stringer hangers
- Stair landing materials








Common questions in Lebanon
- What materials do you use for decks?
- We use Trex composite deck boards a lot, but it depends on the job.
- How long does a deck project usually take?
- Most decks take a few days, though it can vary.
- Do I need a permit to build a deck in New Jersey?
- Yes, most decks in New Jersey need a permit, especially if you're making major changes.