Wind-damaged shingle replacement in Plainfield, NJ
Roof Replacement · Plainfield, NJ · completed August 2023

We recently replaced a roof in Plainfield, NJ, after wind damaged the shingles.
The problem
The wind had pretty much torn up the shingles on this roof. We had to plan the work carefully to get it all sorted out.
What we did
We took off the damaged shingles and got the new ones on quickly. The structure underneath was still in good shape. A job like this usually takes about 1 to 3 days, depending on how big the roof is.
Materials
- We used:
- Asphalt shingles: architectural, three-tab, or designer.
- Starter-strip shingles: installed along the eaves and rakes.
- Hip and ridge cap shingles: to finish the hips and roof peaks.
- Synthetic underlayment or roofing felt: protection under the shingles.
- Ice and water shield: waterproofing at the vulnerable spots.
- Drip edge: metal edging along the eaves and rakes.
- Valley flashing or valley membrane: depending on how the valleys are installed.
- Step flashing: where the roof meets sidewalls.
- Apron and counterflashing: for walls and chimneys, where they apply.
- Pipe boots: to seal around plumbing vent pipes.
- Ridge vents and intake vents: for attic ventilation.
- Roofing nails: sized for the shingles and roof deck.
- Cap nails: to hold down the underlayment.
- Roofing sealant or cement: compatible with the roofing system.
- Plywood or OSB roof decking: to replace damaged sections.
- Decking nails or screws: to secure the replacement sheathing.
- Skylight flashing kits: if there are skylights.




Common questions in Plainfield
- How long does a roof replacement take?
- Usually 1 to 3 days. It depends on the size of the roof.
- Do I need a permit for a roof replacement?
- No, not unless we're replacing the sheathing across the entire roof.
- What materials do you use for roofing?
- For shingle roof replacements, we normally use asphalt shingles with an ice and water barrier underneath.